Involving 150 km of sewerage network, the project was designed in gravitational flow with an intermediate and a main pumping station. Unique engineering highlights were the introduction of the Sequential Batch Reactor and Ultra Violet (UV) Technology for sewerage treatment of 120 MLD capacity and the use of slip form works for the main pumping station involving wet wall construction for operational efficiency.